Final approach
|
Highway 183A Construction Project - 2006 Page 36
|
|
High Gabriel Water Supply Corporation
|
Highway 183A Construction Project - 2006
|
The final connection has been made and water is flowing through the new line to the existing line along South Gabriel Drive. The water line is flushed by opening hydrants at the far end of South Gabriel Drive. Terry coordinates the flushing operation via walkie-talkie as Merv begins to fill in the trench.
|
|
|
|