|
|
The point of no return
|
Highway 183A Construction Project - 2006 Page 35
|
|
High Gabriel Water Supply Corporation
|
Highway 183A Construction Project - 2006
|
There is no turning back now. The existing water line has been cut and must be connected to the new water line in order to restore service to customers along South Gabriel Drive. The new water line running south to Riva Ridge has already been pressure tested and flushed and is already carrying water to customers. South Gabriel Drive is the last section to be connected.
|
|
|
|