High Gabriel Water Supply Corporation
Trencher begins cutting the main trench
Trencher begins cutting the main trench
Highway 183A Construction Project - 2006   Page 13
High Gabriel Water
Supply Corporation
Highway 183A Construction Project - 2006

The trenching machine operator begins to cut the main north-south trench almost perpendicular to the existing Riva Ridge water line. The cutting blade is lined up with the paint marks on the dirt.









High Gabriel Home Page
Previous Page Next Page